Aqua Pro 69717 9 1/2" Long Lead Free Magnesium Anode Rod with 3/4" Male Pipe Thread
Aqua Pro 69717 9 1/2" Long Lead Free Magnesium Anode Rod with 3/4" Male Pipe Thread
Aqua Pro 69717 9 1/2 Long Lead Free Magnesium Anode Rod with 3/4 Male Pipe Thread Model
Product Features
- For suburban and MorFlo water heaters
- Lead free
- 9 inches long
- 3/4 inch male pipe thread
- Bulk
Buy with confidence as this product comes with 18 months full local warranty in Australia & New Zealand (unless otherwise stated in the overview).
This product also comes with the benefits of the CocoonPower Warranty. For further details please read our Warranty Guidelines.
You can also purchase 3 Year Extended Care. If you are interested please see our Extended Care Information.
Related Products
Fluidmaster 1F36 Faucet Connecto...
Fluidmaster 1F36 Faucet Connector, Braided Stainless Steel - 3/8 Female Compression Thread x 1/2 F.I.P. Thread, 3 Ft. (36-Inch) Length
$105.00 AUD
Fluidmaster 1F36 Faucet Connector, Braided Stainless Steel - 3/8 Female Compression Thread x 1/2 F.I.P. Thread, 3 Ft. (36-Inch) Length Fluid master faucet connector, braided, flexible, stainless steel, polymer core, fluid master, 3/8 x 1/2 in nominal, 36 in length, compression x fip end, 1000 psi working, nsf approved. Protect your home with a f...
NDS U-0750-S 3/4-Inch Slip PVC S...
NDS U-0750-S 3/4-Inch Slip PVC Schedule 80 Union, Gray
$96.00 AUD
NDS U-0750-S 3/4-Inch Slip PVC Schedule 80 Union, Gray Nds pipe union, solvent weld, 3/4 in nominal size, slip, 2-1/2 in length, sch 80, 150 psi working, PVC, Gray, nsf listed, iapmo approved. From the Manufacturer King Brothers Inc. U-0750-S 3/4-Inch Slip PVC Schedule 80 Union, Gray Product Features Made with quality PolyOne Sched...
1/4 x 1/4 x 1/4 x...
1/4 x 1/4 x 1/4 x 1/4 Inch NPT Female Thread Cross Pipe Fitting Barstock Cross 4 Way Connector Brass Pipe Fittings 1pack
$95.00 AUD
1/4 x 1/4 x 1/4 x 1/4 Inch NPT Female Thread Cross Pipe Fitting Barstock Cross 4 Way Connector Brass Pipe Fittings Style:1pack This is the Cross Pipe Fitting 1/4 NPT Female Thread, The cross fitting has four openings positioned at 90-degrees from each other for connecting and branching four pipes. It has female threads for connecting to male thr...
uxcell Pipe Fitting Tee G1/2 1...
uxcell Pipe Fitting Tee G1/2 1 Female to 2 Male Thread 3 Way T Shape Swivel Nut Hose Connector Adapter, Nickel-Plated Copper
$105.00 AUD
uxcell Pipe Fitting Tee G1/2 1 Female to 2 Male Thread 3 Way T Shape Swivel Nut Hose Connector Adapter, Nickel-Plated Copper Read more Features: Tee pipe connector with 3 openings for connecting and branching 3 pipes. Surface plating treatment with a bright surface for corrosion resistance, scratch resistance. The 3-way tube fitting is commonly ...
Breezliy 2 PCS Brass Tube Couple...
Breezliy 2 PCS Brass Tube Coupler Pipe Flare Fitting Union Connector Gas Adapter 3/8" Male Flare x 1/4 Inch Male Flare 2PCS 3/8 x1/4
$105.00 AUD
Breezliy 2 PCS Brass Tube Coupler Pipe Flare Fitting Union Connector Gas Adapter 3/8" Male Flare x 1/4 Inch Male Flare Size:2PCS 3/8 x1/4 Material: The union compression pipe joint is made of brass,sturdy and durable, has corrosion resistance,ductility at high temperature and low permeability,and has a torch joint. Operating temperatures range f...
uxcell 50-51mm Pipe Cover Decora...
uxcell 50-51mm Pipe Cover Decoration PP Radiator Escutcheon Water Pipe Wall Cover Black 8 Pcs
$109.00 AUD
uxcell 50-51mm Pipe Cover Decoration PP Radiator Escutcheon Water Pipe Wall Cover Black 8 Pcs Read more UXCELL, our group comprises factories in Asia that manufacture OEM and aftermarket consumer products. We believe in FACTORY DIRECT purchases. Our mission is to deliver Lower Prices and Better Quality to consumers and distributors wherever, whe...
Flexible Shower Hose 59-Inch, AP...
Flexible Shower Hose 59-Inch, APLusee Stainless Steel Replacement Shower Hose with Swivel Brass Adapter, for Shower Head/Bidet Handheld Sprayer Wand 4.9ft, Gold 59" (4.9 ft / 1.5m)
$135.00 AUD
Flexible Shower Hose 59-Inch, APLusee Stainless Steel Replacement Shower Hose with Swivel Brass Adapter, for Shower Head/Bidet Handheld Sprayer Wand 4.9ft, Gold Handheld Shower Hose 59”, APLusee Limber Replaced Hose Extension, Universal Bathroom Faucet Fixtures, 4.9ft Rubber washer strengthen sealing performance to prevent leakage.Rotated Brass ...
uxcell Wall Split Flange, Stainl...
uxcell Wall Split Flange, Stainless Steel Round Escutcheon Plate for 28mm Diameter Pipe 8Pcs
$120.00 AUD
uxcell Wall Split Flange, Stainless Steel Round Escutcheon Plate for 28mm Diameter Pipe 8Pcs Read more The escutcheon plate can be used in the kitchen and toilet to cover the gap between the outside diameter of the pipe and the inside diameter of the opening in the wall surface. Features Split design, easy to install. Open and install around the...
(Pack of 5) EFIELD 3/4" x1/2"X...
(Pack of 5) EFIELD 3/4" x1/2"X 3/4" PEX REDUCING TEE BRASS CRIMP FITTINGS - LEAD FREE 5 PIECES
$145.00 AUD
(Pack of 5) EFIELD 3/4" x1/2"X 3/4" PEX REDUCING TEE BRASS CRIMP FITTINGS - LEAD FREE 5 PIECES Item Package Quantity:5 Directly from the Pex Systems Manufacture 5 Pieces 3/4"x1/2" X 3/4" Pex Reducing Tee Brass Crimp Ftittings, Lead Free Works with All Brands of PEX-b Tubing - Sharkbite, Appollo,Watts, Rifeng, Efield,Viega, Zurn, Nibco,etc. Compa...
POWERTEC 70189 Y-Fitting, 6 x 4...
POWERTEC 70189 Y-Fitting, 6 x 4 x 4"
$142.00 AUD
POWERTEC 70189 Y-Fitting, 6 x 4 x 4" The POWERTEC 6-Inch by 4-Inch by 4-Inch Y-Fitting Connector is the ideal solution when you want to reduce down from a single 6-inch mainline or port to dual 4-inch feeder lines (or hoses and fittings), thus increasing the network flexibility and efficiency in your dust collection system. This handy component ...
OATEY Quiet Pipes 38600 Line Sho...
OATEY Quiet Pipes 38600 Line Shock Absorber, 250 deg F, 200 Psi, copper Quiet Pipes Line Shock Absorber
$166.00 AUD
OATEY Quiet Pipes 38600 Line Shock Absorber, 250 deg F, 200 Psi, copper Quiet Pipes Line Shock Absorber Product Features The product is manufactured in China The product is highly durable and easy to use Easy installation and easy handling Eliminates water pipe banging caused by quick closing valves. ...
Watflow Water Hammer Arrestor, 2...
Watflow Water Hammer Arrestor, 2 Pack, Lead- Free Brass, 3/4"GHT Thread, Water Hammer Arrestor Washing Machine,Pressure reducer, Shock absorbtion
$189.00 AUD
Watflow Water Hammer Arrestor, 2 Pack, Lead- Free Brass, 3/4"GHT Thread, Water Hammer Arrestor Washing Machine,Pressure reducer, Shock absorbtion Product Features Application: Absorb shock and vibration to prevent water hammer noise. Reduce the pressure on the plumbing system. Material:Lead free brass body Thread...
Watts Water Technologies 1/2 LF2...
Watts Water Technologies 1/2 LF288A Watts 288A Anti-Siphon Vacuum Breaker 1/2 In., Brass, Lead Free
$175.00 AUD
Watts Water Technologies 1/2 LF288A Watts 288A Anti-Siphon Vacuum Breaker 1/2 In., Brass, Lead Free This 1/2 inch lead free anti-siphon vacuum breaker for hot or cold water prevents the reverse flow of polluted water from entering into the potable water supply due to backsiphonage. It consists of lead free construction, chemical resistant silico...