Enter NEW5 at Checkout for 5% OFF & Free Shipping Australia Wide

{"id":7061613904023,"title":"Aqua Pro 69717 9 1\/2\" Long Lead Free Magnesium Anode Rod with 3\/4\" Male Pipe Thread","handle":"aqua-pro-69717-9-1-2-long-lead-free-magnesium-anode-rod-with-3-4-male-pipe-thread","description":"\u003ch3\u003eAqua Pro 69717 9 1\/2\" Long Lead Free Magnesium Anode Rod with 3\/4\" Male Pipe Thread\u003c\/h3\u003e\n\u003cp id=\"b\"\u003eAqua Pro 69717 9 1\/2 Long Lead Free Magnesium Anode Rod with 3\/4 Male Pipe\nThread Model\u003c\/p\u003e \n\n\u003ch3\u003eProduct Features\u003c\/h3\u003e\n \u003cul class=\"a\"\u003e\n \u003cli\u003eFor suburban and MorFlo water heaters\u003c\/li\u003e\n \u003cli\u003eLead free\u003c\/li\u003e\n \u003cli\u003e9 inches long\u003c\/li\u003e\n \u003cli\u003e3\/4 inch male pipe thread\u003c\/li\u003e\n \u003cli\u003eBulk\u003c\/li\u003e\n \u003c\/ul\u003e","published_at":"2021-08-03T03:05:40+10:00","created_at":"2021-08-03T03:05:40+10:00","vendor":"AQUAPRO","type":"Pipe Fittings","tags":["nn08"],"price":13900,"price_min":13900,"price_max":13900,"available":true,"price_varies":false,"compare_at_price":null,"compare_at_price_min":0,"compare_at_price_max":0,"compare_at_price_varies":false,"variants":[{"id":40648641052823,"title":"Default Title","option1":"Default Title","option2":null,"option3":null,"sku":"B0085IJLR2","requires_shipping":true,"taxable":true,"featured_image":null,"available":true,"name":"Aqua Pro 69717 9 1\/2\" Long Lead Free Magnesium Anode Rod with 3\/4\" Male Pipe Thread","public_title":null,"options":["Default Title"],"price":13900,"weight":181,"compare_at_price":null,"inventory_management":null,"barcode":"69717","requires_selling_plan":false,"selling_plan_allocations":[]}],"images":["\/\/newnestshop.com\/cdn\/shop\/products\/B0085IJLR2.jpg?v=1651853607"],"featured_image":"\/\/newnestshop.com\/cdn\/shop\/products\/B0085IJLR2.jpg?v=1651853607","options":["Title"],"media":[{"alt":"Aqua Pro 69717 9 1\/2\" Long Lead Free Magnesium Anode Rod with 3\/4\" Male Pipe Thread - NewNest Australia","id":27875225469079,"position":1,"preview_image":{"aspect_ratio":5.727,"height":447,"width":2560,"src":"\/\/newnestshop.com\/cdn\/shop\/products\/B0085IJLR2.jpg?v=1651853607"},"aspect_ratio":5.727,"height":447,"media_type":"image","src":"\/\/newnestshop.com\/cdn\/shop\/products\/B0085IJLR2.jpg?v=1651853607","width":2560}],"requires_selling_plan":false,"selling_plan_groups":[],"content":"\u003ch3\u003eAqua Pro 69717 9 1\/2\" Long Lead Free Magnesium Anode Rod with 3\/4\" Male Pipe Thread\u003c\/h3\u003e\n\u003cp id=\"b\"\u003eAqua Pro 69717 9 1\/2 Long Lead Free Magnesium Anode Rod with 3\/4 Male Pipe\nThread Model\u003c\/p\u003e \n\n\u003ch3\u003eProduct Features\u003c\/h3\u003e\n \u003cul class=\"a\"\u003e\n \u003cli\u003eFor suburban and MorFlo water heaters\u003c\/li\u003e\n \u003cli\u003eLead free\u003c\/li\u003e\n \u003cli\u003e9 inches long\u003c\/li\u003e\n \u003cli\u003e3\/4 inch male pipe thread\u003c\/li\u003e\n \u003cli\u003eBulk\u003c\/li\u003e\n \u003c\/ul\u003e"}

Aqua Pro 69717 9 1/2" Long Lead Free Magnesium Anode Rod with 3/4" Male Pipe Thread

In Stock. Leaves warehouse within 2 - 3 business days

$139.00 AUD
Maximum quantity available reached.
Free Shipping Australia Wide
100% Safe & Secure Checkout
100 Days Return Policy *
1 Year Warranty *

Aqua Pro 69717 9 1/2" Long Lead Free Magnesium Anode Rod with 3/4" Male Pipe Thread

Aqua Pro 69717 9 1/2 Long Lead Free Magnesium Anode Rod with 3/4 Male Pipe Thread Model

Product Features

  • For suburban and MorFlo water heaters
  • Lead free
  • 9 inches long
  • 3/4 inch male pipe thread
  • Bulk

Buy with confidence as this product comes with 18 months full local warranty in Australia & New Zealand (unless otherwise stated in the overview).

This product also comes with the benefits of the CocoonPower Warranty. For further details please read our Warranty Guidelines.

You can also purchase 3 Year Extended Care. If you are interested please see our Extended Care Information.

Related Products