Shop with Confidence — Free Shipping on All Orders

{"id":8831767478423,"title":"100pcs 3mm Blue Lights LED Diodes Flat Lens 29mm Long Lead (DC 3V) +100pcs Resistors (for DC 6-12V) Included, Bright Bulb Lamps Light Emitting Diode [08] Blue \/ 100pcs 3mm Flat Top","handle":"100pcs-3mm-blue-lights-led-diodes-flat-lens-29mm-long-lead-dc-3v-100pcs-resistors-for-dc-6-12v-included-bright-bulb-lamps-light-emitting-diode-08-blue-100pcs-3mm-flat-top","description":"\u003ch3\u003e100pcs 3mm Blue Lights LED Diodes Flat Lens 29mm Long Lead (DC 3V) +100pcs Resistors (for DC 6-12V) Included, Bright Bulb Lamps Light Emitting Diode\u003c\/h3\u003e\n\u003cp id=\"b\"\u003eLow Energy Consumption And Low Heat. Industrial Standard Size,29mm Long Lead for widely used and convenient for cperation. Soldering Condition (Manual Soldering):Less Than 3 Seconds With 482°F-527°F Soldering Condition (Reflow Soldering):Less Than 5 Seconds With 500°F Storage Conditions: Drying Preservation And Keep Away From Fire Or High Temperature. Get other LED models? Please search \"EDGELEC Diodes\".\u003c\/p\u003e \n\n\u003ch3\u003eProduct Features\u003c\/h3\u003e\n \u003cul class=\"a\"\u003e\n \u003cli\u003eProduct Overview: 100 pcs LED Diodes + 100 pcs Resistors\u003c\/li\u003e\n \u003cli\u003eProduct Features: Blue Lights \/ 3mm Flat Clear lens\u003c\/li\u003e\n \u003cli\u003eProduct Parameters: 29mm Long Lead \/ DC 3.0V-3.2V (IF=20mA) \/ 0.06 Watts \/ 2pin \/ DIP LEDs\u003c\/li\u003e\n \u003cli\u003eProduct Parameters: Luminance Brighter Up To +20% \/ Wavelength 460nm-470nm \/ 60 Viewing Angle \/ Single LED Diodes Wight: 0.15g\u003c\/li\u003e\n \u003cli\u003eAccessories: 100pcs 430ohm (For DC 6-12V) 1\/4 Watt Metal Film Resistors Included \/ 1% Tolerance\u003c\/li\u003e\n \u003c\/ul\u003e","published_at":"2025-02-18T14:49:46+11:00","created_at":"2025-02-13T23:48:07+11:00","vendor":"EDGELEC","type":"LED Lamps","tags":["industrial_best_sellers_Jan2025"],"price":8500,"price_min":8500,"price_max":8500,"available":true,"price_varies":false,"compare_at_price":null,"compare_at_price_min":0,"compare_at_price_max":0,"compare_at_price_varies":false,"variants":[{"id":45178099695767,"title":"Default Title","option1":"Default Title","option2":null,"option3":null,"sku":"B077XDQ4M1","requires_shipping":true,"taxable":true,"featured_image":null,"available":true,"name":"100pcs 3mm Blue Lights LED Diodes Flat Lens 29mm Long Lead (DC 3V) +100pcs Resistors (for DC 6-12V) Included, Bright Bulb Lamps Light Emitting Diode [08] Blue \/ 100pcs 3mm Flat Top","public_title":null,"options":["Default Title"],"price":8500,"weight":35,"compare_at_price":null,"inventory_management":"shopify","barcode":"611355169092","requires_selling_plan":false,"selling_plan_allocations":[],"quantity_rule":{"min":1,"max":null,"increment":1}}],"images":["\/\/newnestshop.com\/cdn\/shop\/files\/B077XDQ4M1.jpg?v=1775775989","\/\/newnestshop.com\/cdn\/shop\/files\/51IqwHBJAIL_94b114f9-15ac-4f5d-892e-133ea356ee43.jpg?v=1739450890","\/\/newnestshop.com\/cdn\/shop\/files\/71e6kEpS-YL_47a1b58b-b8a4-4b0c-8576-fa70fc07a153.jpg?v=1739450890","\/\/newnestshop.com\/cdn\/shop\/files\/61uwXqCSBYL.jpg?v=1739450890","\/\/newnestshop.com\/cdn\/shop\/files\/51p5ehiOtGL.jpg?v=1739450890"],"featured_image":"\/\/newnestshop.com\/cdn\/shop\/files\/B077XDQ4M1.jpg?v=1775775989","options":["Title"],"media":[{"alt":null,"id":37010708234391,"position":1,"preview_image":{"aspect_ratio":1.0,"height":1300,"width":1300,"src":"\/\/newnestshop.com\/cdn\/shop\/files\/B077XDQ4M1.jpg?v=1775775989"},"aspect_ratio":1.0,"height":1300,"media_type":"image","src":"\/\/newnestshop.com\/cdn\/shop\/files\/B077XDQ4M1.jpg?v=1775775989","width":1300},{"alt":null,"id":37010708267159,"position":2,"preview_image":{"aspect_ratio":1.779,"height":768,"width":1366,"src":"\/\/newnestshop.com\/cdn\/shop\/files\/51IqwHBJAIL_94b114f9-15ac-4f5d-892e-133ea356ee43.jpg?v=1739450890"},"aspect_ratio":1.779,"height":768,"media_type":"image","src":"\/\/newnestshop.com\/cdn\/shop\/files\/51IqwHBJAIL_94b114f9-15ac-4f5d-892e-133ea356ee43.jpg?v=1739450890","width":1366},{"alt":null,"id":37010708299927,"position":3,"preview_image":{"aspect_ratio":1.5,"height":1067,"width":1600,"src":"\/\/newnestshop.com\/cdn\/shop\/files\/71e6kEpS-YL_47a1b58b-b8a4-4b0c-8576-fa70fc07a153.jpg?v=1739450890"},"aspect_ratio":1.5,"height":1067,"media_type":"image","src":"\/\/newnestshop.com\/cdn\/shop\/files\/71e6kEpS-YL_47a1b58b-b8a4-4b0c-8576-fa70fc07a153.jpg?v=1739450890","width":1600},{"alt":null,"id":37010708332695,"position":4,"preview_image":{"aspect_ratio":1.0,"height":1300,"width":1300,"src":"\/\/newnestshop.com\/cdn\/shop\/files\/61uwXqCSBYL.jpg?v=1739450890"},"aspect_ratio":1.0,"height":1300,"media_type":"image","src":"\/\/newnestshop.com\/cdn\/shop\/files\/61uwXqCSBYL.jpg?v=1739450890","width":1300},{"alt":null,"id":37010708365463,"position":5,"preview_image":{"aspect_ratio":1.0,"height":1300,"width":1300,"src":"\/\/newnestshop.com\/cdn\/shop\/files\/51p5ehiOtGL.jpg?v=1739450890"},"aspect_ratio":1.0,"height":1300,"media_type":"image","src":"\/\/newnestshop.com\/cdn\/shop\/files\/51p5ehiOtGL.jpg?v=1739450890","width":1300}],"requires_selling_plan":false,"selling_plan_groups":[],"content":"\u003ch3\u003e100pcs 3mm Blue Lights LED Diodes Flat Lens 29mm Long Lead (DC 3V) +100pcs Resistors (for DC 6-12V) Included, Bright Bulb Lamps Light Emitting Diode\u003c\/h3\u003e\n\u003cp id=\"b\"\u003eLow Energy Consumption And Low Heat. Industrial Standard Size,29mm Long Lead for widely used and convenient for cperation. Soldering Condition (Manual Soldering):Less Than 3 Seconds With 482°F-527°F Soldering Condition (Reflow Soldering):Less Than 5 Seconds With 500°F Storage Conditions: Drying Preservation And Keep Away From Fire Or High Temperature. Get other LED models? Please search \"EDGELEC Diodes\".\u003c\/p\u003e \n\n\u003ch3\u003eProduct Features\u003c\/h3\u003e\n \u003cul class=\"a\"\u003e\n \u003cli\u003eProduct Overview: 100 pcs LED Diodes + 100 pcs Resistors\u003c\/li\u003e\n \u003cli\u003eProduct Features: Blue Lights \/ 3mm Flat Clear lens\u003c\/li\u003e\n \u003cli\u003eProduct Parameters: 29mm Long Lead \/ DC 3.0V-3.2V (IF=20mA) \/ 0.06 Watts \/ 2pin \/ DIP LEDs\u003c\/li\u003e\n \u003cli\u003eProduct Parameters: Luminance Brighter Up To +20% \/ Wavelength 460nm-470nm \/ 60 Viewing Angle \/ Single LED Diodes Wight: 0.15g\u003c\/li\u003e\n \u003cli\u003eAccessories: 100pcs 430ohm (For DC 6-12V) 1\/4 Watt Metal Film Resistors Included \/ 1% Tolerance\u003c\/li\u003e\n \u003c\/ul\u003e"}

100pcs 3mm Blue Lights LED Diodes Flat Lens 29mm Long Lead (DC 3V) +100pcs Resistors (for DC 6-12V) Included, Bright Bulb Lamps Light Emitting Diode [08] Blue / 100pcs 3mm Flat Top

In Stock. Leaves warehouse within 2 - 3 business days

$85.00 AUD
Maximum quantity available reached.
Free Shipping Australia Wide
100% Safe & Secure Checkout
100 Days Return Policy *
1 Year Warranty *

100pcs 3mm Blue Lights LED Diodes Flat Lens 29mm Long Lead (DC 3V) +100pcs Resistors (for DC 6-12V) Included, Bright Bulb Lamps Light Emitting Diode

Low Energy Consumption And Low Heat. Industrial Standard Size,29mm Long Lead for widely used and convenient for cperation. Soldering Condition (Manual Soldering):Less Than 3 Seconds With 482°F-527°F Soldering Condition (Reflow Soldering):Less Than 5 Seconds With 500°F Storage Conditions: Drying Preservation And Keep Away From Fire Or High Temperature. Get other LED models? Please search "EDGELEC Diodes".

Product Features

  • Product Overview: 100 pcs LED Diodes + 100 pcs Resistors
  • Product Features: Blue Lights / 3mm Flat Clear lens
  • Product Parameters: 29mm Long Lead / DC 3.0V-3.2V (IF=20mA) / 0.06 Watts / 2pin / DIP LEDs
  • Product Parameters: Luminance Brighter Up To +20% / Wavelength 460nm-470nm / 60 Viewing Angle / Single LED Diodes Wight: 0.15g
  • Accessories: 100pcs 430ohm (For DC 6-12V) 1/4 Watt Metal Film Resistors Included / 1% Tolerance

Buy with confidence as this product comes with 18 months full local warranty in Australia & New Zealand (unless otherwise stated in the overview).

This product also comes with the benefits of the CocoonPower Warranty. For further details please read our Warranty Guidelines.

You can also purchase 3 Year Extended Care. If you are interested please see our Extended Care Information.