Shop with Confidence — Free Shipping on All Orders

{"id":8340601667735,"title":"Kai KAI nail clipper type001 S curved blade with stopper case made in Japan Hand KF1000","handle":"kai-kai-nail-clipper-type001-s-curved-blade-with-stopper-case-made-in-japan-hand-kf1000","description":"\u003ch2\u003e KAI Nail Clipper type001 S curved blade with stopper case made in Japan Hand KF1000 \u003c\/h2\u003e\u003ch3\u003e \u003cspan\u003eProduct Description\u003c\/span\u003e \u003c\/h3\u003e \u003cp\u003e \u003cspan\u003eThe japanese nail cutting edge is made with high quality stainless steel knife that is unique to Japan for a long time. The design is not only sharp but also prevents the nails from scattering easily. The stainless steel blade is rust resistant, so it can be used for a long time. Even if you hand wash your nails with a clean surface that will leave bacteria, it is particularly prone to bacteria around the nails. Cut your nails frequently to keep them clean even a little bit of a little bit If you use a comfortable nail clipper, you can also enjoy the hassle of cutting nails. The cover is made of a material containing an antibacterial agent, and the cover is also made with an anti-microbial agent, so you can always use it clean. Keep things hygienic when you use them to care for your swelling. Choosing a reliable manufacturer or brand is important to choose a high-quality product that is unique to a reliable blade maker. Kai Corporation was founded in 1908 and has a wide range of cutlery products, from beauty to kitchen and medical use. The high quality is attractive using the technology unique to a comprehensive knife maker. The 119 \"119\" shellfish has a large number of hygiene products, including nail clippers and nippers. The hygienic construction is attractive with no wastage that is unique to the brand that has been working on care products.\u003c\/span\u003e \u003c\/p\u003e \u003ch3\u003e \u003cspan\u003eIngredients\u003c\/span\u003e \u003c\/h3\u003e \u003cp\u003e \u003cspan\u003ePrecautions for Use: Deep nails are subject to injury. Do not cut too much. Please store it in a safe place that is not accessible to infants. Do not use for purposes other than cutting claws\u003c\/span\u003e \u003c\/p\u003e\u003cul class=\"a-unordered-list a-vertical a-spacing-mini\"\u003e \u003cli class=\"a-spacing-mini\"\u003e\n\u003cspan class=\"a-list-item\"\u003e Simple design for both men and women: The color is classic white. Can be used without hesitation . Quality indication: Blade: Stainless steel cutlery; Lever: Reinforced nylon; Cover: ABS resin (contains antibacterial agent); Stopper: Polypropylene (contains antibacterial agent); File: Stainless steel; Country of Origin: Japan \u003c\/span\u003e li\u0026gt; \u003c\/li\u003e\n\u003cli class=\"a-spacing-mini\"\u003e\u003cspan class=\"a-list-item\"\u003e [Easy to cut and splash resistant] Features a stopper case on the side. Cut nails are made to prevent splattering. Finally cut nails can be discarded \u003c\/span\u003e\u003c\/li\u003e \u003cli class=\"a-spacing-mini\"\u003e\u003cspan class=\"a-list-item\"\u003e Antibacterial resin \u003c\/span\u003e\u003c\/li\u003e \u003cli class=\"a-spacing-mini\"\u003e\u003cspan class=\"a-list-item\"\u003e Achieves Sharp Sharpness: The new standard nail clippers feature a sharp edge that is unique to stainless steel blades. Rhythmic and comfortable to cut nails. It is also one of the features that it is rust resistant and has a long lasting sharpness \u003c\/span\u003e\u003c\/li\u003e \u003cli class=\"a-spacing-mini\"\u003e\u003cspan class=\"a-list-item\"\u003e Includes file to adjust the finish: The main unit is equipped with etched claws With one piece, you can consistently handle from nail clipping to sanding. Not only do you cut, but also feel the smooth finish \u003c\/span\u003e\u003c\/li\u003e \u0026lt; li class=\"a-spacing-mini\"\u0026gt;\u003cspan class=\"a-list-item\"\u003e 【For Finely Trimming】Small size has a small curve at the tip which is perfect for when you want to trim your nails. is also suitable to use with regular size nail clippers and nippers for nail careful care. Can be used for both hand and foot nails \u003c\/span\u003e \u003c\/ul\u003e","published_at":"2024-04-25T00:39:07+10:00","created_at":"2024-04-25T00:39:16+10:00","vendor":"Kai Corporation","type":"Health Beauty","tags":["healthJAPAN_March2024"],"price":12200,"price_min":12200,"price_max":12200,"available":true,"price_varies":false,"compare_at_price":null,"compare_at_price_min":0,"compare_at_price_max":0,"compare_at_price_varies":false,"variants":[{"id":44117802516631,"title":"Default Title","option1":"Default Title","option2":null,"option3":null,"sku":"jp-B009Z935R2","requires_shipping":true,"taxable":true,"featured_image":null,"available":true,"name":"Kai KAI nail clipper type001 S curved blade with stopper case made in Japan Hand KF1000","public_title":null,"options":["Default Title"],"price":12200,"weight":0,"compare_at_price":null,"inventory_management":"shopify","barcode":null,"requires_selling_plan":false,"selling_plan_allocations":[],"quantity_rule":{"min":1,"max":null,"increment":1}}],"images":["\/\/newnestshop.com\/cdn\/shop\/files\/jp-B009Z935R2.jpg?v=1714005606","\/\/newnestshop.com\/cdn\/shop\/files\/51hsqV4nubL._AC_SX679.jpg?v=1713969556","\/\/newnestshop.com\/cdn\/shop\/files\/61Nkh_r_PHL._AC_SX679.jpg?v=1713969556","\/\/newnestshop.com\/cdn\/shop\/files\/71ggadwTMZL._AC_SX679.jpg?v=1713969556","\/\/newnestshop.com\/cdn\/shop\/files\/71yje5n0FuL._AC_SX679.jpg?v=1713969556","\/\/newnestshop.com\/cdn\/shop\/files\/71hZwLCOeNL._AC_SX679.jpg?v=1713969556"],"featured_image":"\/\/newnestshop.com\/cdn\/shop\/files\/jp-B009Z935R2.jpg?v=1714005606","options":["Title"],"media":[{"alt":"Kai KAI nail clipper type001 S curved blade with stopper case made in Japan Hand KF1000 - NewNest Australia","id":34230453764247,"position":1,"preview_image":{"aspect_ratio":1.35,"height":503,"width":679,"src":"\/\/newnestshop.com\/cdn\/shop\/files\/jp-B009Z935R2.jpg?v=1714005606"},"aspect_ratio":1.35,"height":503,"media_type":"image","src":"\/\/newnestshop.com\/cdn\/shop\/files\/jp-B009Z935R2.jpg?v=1714005606","width":679},{"alt":"Kai KAI nail clipper type001 S curved blade with stopper case made in Japan Hand KF1000 - NewNest Australia","id":34225140072599,"position":2,"preview_image":{"aspect_ratio":0.878,"height":773,"width":679,"src":"\/\/newnestshop.com\/cdn\/shop\/files\/51hsqV4nubL._AC_SX679.jpg?v=1713969556"},"aspect_ratio":0.878,"height":773,"media_type":"image","src":"\/\/newnestshop.com\/cdn\/shop\/files\/51hsqV4nubL._AC_SX679.jpg?v=1713969556","width":679},{"alt":"Kai KAI nail clipper type001 S curved blade with stopper case made in Japan Hand KF1000 - NewNest Australia","id":34225140105367,"position":3,"preview_image":{"aspect_ratio":1.0,"height":679,"width":679,"src":"\/\/newnestshop.com\/cdn\/shop\/files\/61Nkh_r_PHL._AC_SX679.jpg?v=1713969556"},"aspect_ratio":1.0,"height":679,"media_type":"image","src":"\/\/newnestshop.com\/cdn\/shop\/files\/61Nkh_r_PHL._AC_SX679.jpg?v=1713969556","width":679},{"alt":"Kai KAI nail clipper type001 S curved blade with stopper case made in Japan Hand KF1000 - NewNest Australia","id":34225140138135,"position":4,"preview_image":{"aspect_ratio":0.671,"height":1012,"width":679,"src":"\/\/newnestshop.com\/cdn\/shop\/files\/71ggadwTMZL._AC_SX679.jpg?v=1713969556"},"aspect_ratio":0.671,"height":1012,"media_type":"image","src":"\/\/newnestshop.com\/cdn\/shop\/files\/71ggadwTMZL._AC_SX679.jpg?v=1713969556","width":679},{"alt":"Kai KAI nail clipper type001 S curved blade with stopper case made in Japan Hand KF1000 - NewNest Australia","id":34225140170903,"position":5,"preview_image":{"aspect_ratio":1.377,"height":493,"width":679,"src":"\/\/newnestshop.com\/cdn\/shop\/files\/71yje5n0FuL._AC_SX679.jpg?v=1713969556"},"aspect_ratio":1.377,"height":493,"media_type":"image","src":"\/\/newnestshop.com\/cdn\/shop\/files\/71yje5n0FuL._AC_SX679.jpg?v=1713969556","width":679},{"alt":"Kai KAI nail clipper type001 S curved blade with stopper case made in Japan Hand KF1000 - NewNest Australia","id":34225140203671,"position":6,"preview_image":{"aspect_ratio":1.0,"height":679,"width":679,"src":"\/\/newnestshop.com\/cdn\/shop\/files\/71hZwLCOeNL._AC_SX679.jpg?v=1713969556"},"aspect_ratio":1.0,"height":679,"media_type":"image","src":"\/\/newnestshop.com\/cdn\/shop\/files\/71hZwLCOeNL._AC_SX679.jpg?v=1713969556","width":679}],"requires_selling_plan":false,"selling_plan_groups":[],"content":"\u003ch2\u003e KAI Nail Clipper type001 S curved blade with stopper case made in Japan Hand KF1000 \u003c\/h2\u003e\u003ch3\u003e \u003cspan\u003eProduct Description\u003c\/span\u003e \u003c\/h3\u003e \u003cp\u003e \u003cspan\u003eThe japanese nail cutting edge is made with high quality stainless steel knife that is unique to Japan for a long time. The design is not only sharp but also prevents the nails from scattering easily. The stainless steel blade is rust resistant, so it can be used for a long time. Even if you hand wash your nails with a clean surface that will leave bacteria, it is particularly prone to bacteria around the nails. Cut your nails frequently to keep them clean even a little bit of a little bit If you use a comfortable nail clipper, you can also enjoy the hassle of cutting nails. The cover is made of a material containing an antibacterial agent, and the cover is also made with an anti-microbial agent, so you can always use it clean. Keep things hygienic when you use them to care for your swelling. Choosing a reliable manufacturer or brand is important to choose a high-quality product that is unique to a reliable blade maker. Kai Corporation was founded in 1908 and has a wide range of cutlery products, from beauty to kitchen and medical use. The high quality is attractive using the technology unique to a comprehensive knife maker. The 119 \"119\" shellfish has a large number of hygiene products, including nail clippers and nippers. The hygienic construction is attractive with no wastage that is unique to the brand that has been working on care products.\u003c\/span\u003e \u003c\/p\u003e \u003ch3\u003e \u003cspan\u003eIngredients\u003c\/span\u003e \u003c\/h3\u003e \u003cp\u003e \u003cspan\u003ePrecautions for Use: Deep nails are subject to injury. Do not cut too much. Please store it in a safe place that is not accessible to infants. Do not use for purposes other than cutting claws\u003c\/span\u003e \u003c\/p\u003e\u003cul class=\"a-unordered-list a-vertical a-spacing-mini\"\u003e \u003cli class=\"a-spacing-mini\"\u003e\n\u003cspan class=\"a-list-item\"\u003e Simple design for both men and women: The color is classic white. Can be used without hesitation . Quality indication: Blade: Stainless steel cutlery; Lever: Reinforced nylon; Cover: ABS resin (contains antibacterial agent); Stopper: Polypropylene (contains antibacterial agent); File: Stainless steel; Country of Origin: Japan \u003c\/span\u003e li\u0026gt; \u003c\/li\u003e\n\u003cli class=\"a-spacing-mini\"\u003e\u003cspan class=\"a-list-item\"\u003e [Easy to cut and splash resistant] Features a stopper case on the side. Cut nails are made to prevent splattering. Finally cut nails can be discarded \u003c\/span\u003e\u003c\/li\u003e \u003cli class=\"a-spacing-mini\"\u003e\u003cspan class=\"a-list-item\"\u003e Antibacterial resin \u003c\/span\u003e\u003c\/li\u003e \u003cli class=\"a-spacing-mini\"\u003e\u003cspan class=\"a-list-item\"\u003e Achieves Sharp Sharpness: The new standard nail clippers feature a sharp edge that is unique to stainless steel blades. Rhythmic and comfortable to cut nails. It is also one of the features that it is rust resistant and has a long lasting sharpness \u003c\/span\u003e\u003c\/li\u003e \u003cli class=\"a-spacing-mini\"\u003e\u003cspan class=\"a-list-item\"\u003e Includes file to adjust the finish: The main unit is equipped with etched claws With one piece, you can consistently handle from nail clipping to sanding. Not only do you cut, but also feel the smooth finish \u003c\/span\u003e\u003c\/li\u003e \u0026lt; li class=\"a-spacing-mini\"\u0026gt;\u003cspan class=\"a-list-item\"\u003e 【For Finely Trimming】Small size has a small curve at the tip which is perfect for when you want to trim your nails. is also suitable to use with regular size nail clippers and nippers for nail careful care. Can be used for both hand and foot nails \u003c\/span\u003e \u003c\/ul\u003e"}

Kai KAI nail clipper type001 S curved blade with stopper case made in Japan Hand KF1000

In Stock. Leaves warehouse within 2 - 3 business days

$122.00 AUD
Maximum quantity available reached.
Free Shipping Australia Wide
100% Safe & Secure Checkout
100 Days Return Policy *
1 Year Warranty *

KAI Nail Clipper type001 S curved blade with stopper case made in Japan Hand KF1000

Product Description

The japanese nail cutting edge is made with high quality stainless steel knife that is unique to Japan for a long time. The design is not only sharp but also prevents the nails from scattering easily. The stainless steel blade is rust resistant, so it can be used for a long time. Even if you hand wash your nails with a clean surface that will leave bacteria, it is particularly prone to bacteria around the nails. Cut your nails frequently to keep them clean even a little bit of a little bit If you use a comfortable nail clipper, you can also enjoy the hassle of cutting nails. The cover is made of a material containing an antibacterial agent, and the cover is also made with an anti-microbial agent, so you can always use it clean. Keep things hygienic when you use them to care for your swelling. Choosing a reliable manufacturer or brand is important to choose a high-quality product that is unique to a reliable blade maker. Kai Corporation was founded in 1908 and has a wide range of cutlery products, from beauty to kitchen and medical use. The high quality is attractive using the technology unique to a comprehensive knife maker. The 119 "119" shellfish has a large number of hygiene products, including nail clippers and nippers. The hygienic construction is attractive with no wastage that is unique to the brand that has been working on care products.

Ingredients

Precautions for Use: Deep nails are subject to injury. Do not cut too much. Please store it in a safe place that is not accessible to infants. Do not use for purposes other than cutting claws

  • Simple design for both men and women: The color is classic white. Can be used without hesitation . Quality indication: Blade: Stainless steel cutlery; Lever: Reinforced nylon; Cover: ABS resin (contains antibacterial agent); Stopper: Polypropylene (contains antibacterial agent); File: Stainless steel; Country of Origin: Japan li>
  • [Easy to cut and splash resistant] Features a stopper case on the side. Cut nails are made to prevent splattering. Finally cut nails can be discarded
  • Antibacterial resin
  • Achieves Sharp Sharpness: The new standard nail clippers feature a sharp edge that is unique to stainless steel blades. Rhythmic and comfortable to cut nails. It is also one of the features that it is rust resistant and has a long lasting sharpness
  • Includes file to adjust the finish: The main unit is equipped with etched claws With one piece, you can consistently handle from nail clipping to sanding. Not only do you cut, but also feel the smooth finish
  • < li class="a-spacing-mini"> 【For Finely Trimming】Small size has a small curve at the tip which is perfect for when you want to trim your nails. is also suitable to use with regular size nail clippers and nippers for nail careful care. Can be used for both hand and foot nails

Buy with confidence as this product comes with 18 months full local warranty in Australia & New Zealand (unless otherwise stated in the overview).

This product also comes with the benefits of the CocoonPower Warranty. For further details please read our Warranty Guidelines.

You can also purchase 3 Year Extended Care. If you are interested please see our Extended Care Information.